[Sisyphus-mipsel-reports] [#21490] sisyphus_mipsel FAILED (try 2) srpm=gmetrics-0.7-alt1_5jpp8.src.rpm
Girar awaiter robot
awaiter at gyle-secondary.office.basealt.ru
Sun Feb 17 11:10:08 MSK 2019
http://git.altlinux.org/tasks/21490/logs/events.2.2.log
2019-Feb-17 08:03:38 :: task #21490 for sisyphus_mipsel resumed by recycler:
#100 build gmetrics-0.7-alt1_5jpp8.src.rpm
2019-Feb-17 08:03:38 :: waiting for a shared lock on sisyphus_mipsel
2019-Feb-17 08:03:46 :: acquired a shared lock on sisyphus_mipsel
2019-Feb-17 08:03:47 :: [mipsel] #100 gmetrics-0.7-alt1_5jpp8.src.rpm: build start
[ERROR] at org.codehaus.plexus.classworlds.launcher.Launcher.launch(Launcher.java:229)
[ERROR] at org.codehaus.plexus.classworlds.launcher.Launcher.mainWithExitCode(Launcher.java:415)
[ERROR] at org.codehaus.plexus.classworlds.launcher.Launcher.main(Launcher.java:356)
[ERROR] -> [Help 1]
[ERROR]
[ERROR] To see the full stack trace of the errors, re-run Maven with the -e switch.
[ERROR] Re-run Maven using the -X switch to enable full debug logging.
[ERROR]
[ERROR] For more information about the errors and possible solutions, please read the following articles:
[ERROR] [Help 1] http://cwiki.apache.org/confluence/display/MAVEN/MojoExecutionException
2019-Feb-17 08:10:07 :: [mipsel] gmetrics-0.7-alt1_5jpp8.src.rpm: remote: build failed
2019-Feb-17 08:10:08 :: [mipsel] #100 gmetrics-0.7-alt1_5jpp8.src.rpm: build FAILED
2019-Feb-17 08:10:08 :: [mipsel] build FAILED
2019-Feb-17 08:10:08 :: task #21490 for sisyphus_mipsel FAILED
More information about the Sisyphus-mipsel-reports
mailing list